
54
NXR5i
25/09/2012 - 300029104-001-02
65 NXR5i-18 to NXR5i-25
Fitting the walkway
Package FA17 to FA24
Package MR339
Package FA16
`
Place the rear plate, which is 1200 mm long
.
`
Fasten with 2 screws (H8 x 30) and serrated washers.
`
Place the front plate with the round holes towards the front of the boiler
.
`
Fasten with 4 screws (H8 x 30) and serrated washers.
`
Fasten the joining plate
with the round holes towards the front of the boiler with 4 tapping screws and serrated washers.
66 Package FA30 to FA41
`
Put in place the sweeping cover insulating material(packages FA30 to FA41):
- NXR5i-14 to NXR5i-17: 2 pieces.
- NXR5i-18 to NXR5i-25: 4 pieces.
C003944-A
C003946-A
Summary of Contents for NXR5i
Page 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Page 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Page 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Page 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Page 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...