
51
25/09/2012 - 300029104-001-02
NXR5i
60 package
MR338
or
MR339
`
Place the retaining crosspiece (package MR338 or MR339) on the left and right-hand front panels, taking care to place the 2 central tabs
behind the furnace door panel.
`
Fit the upper front panel (package MR338 or MR339) onto the side panels via the 4 studs.
61 package MR338 or MR339
`
Put in place the insulation of the flue gas box and the lower rear insulating material (package MR338 or MR339).
If the side crosspieces overlap at the rear by more than 10 mm, we advise you to saw them off using a hacksaw.
0
1
M000125
Summary of Contents for NXR5i
Page 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Page 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Page 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Page 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Page 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...