
35
25/09/2012 - 300029104-001-02
NXR5i
36 NXR5i-14 to NXR5i-17: Package FA30 to FA36
Assembling the top insulating material
Front
`
Put in place the 600 mm wide (packages FA30 to FA36) top insulating material on the body of the boiler.
37 NXR5i-14 to NXR5i-17: Package FA17 to FA27
Assembling the cable channels
Rear
`
Place the cable channels so that their bevelled end is to the front.
`
Fasten with 2 screws H8 x 16 + L8 washers in the third hole starting from the front and opposite the special nut.
`
Fasten at the rear with 2 screws H8 x 16 + L8 washers opposite the oblong holes and special nut.
M000099
80
90
1
Number of sections
14
15 or 16
17
Length (mm)
1800
2100
2200
0
0
M0
010
AVANT
1
Summary of Contents for NXR5i
Page 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Page 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Page 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Page 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Page 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...