Post PR19.150.2 Operator'S Manual Download Page 1

POST MATERIAL HANDLING 

21 Stone Castle Road, Rock Tavern, NY 12575 

www.posthoist.com

 845-200-3355 

  
 
 
 
 
 

OPERATOR MANUAL 
PORTABLE BAG LIFT 

POST MATERIAL HANDLING 

SERIAL NUMBER PR19.150.2 

 

 

Summary of Contents for PR19.150.2

Page 1: ...POST MATERIAL HANDLING 21 Stone Castle Road Rock Tavern NY 12575 www posthoist com 845 200 3355 OPERATOR MANUAL PORTABLE BAG LIFT POST MATERIAL HANDLING SERIAL NUMBER PR19 150 2 ...

Page 2: ...able of contents INTRODUCTION 3 DESCRIPTION 3 PRINCIPLE OF OPERATION 3 GENERAL SPECIFICATIONS 3 POST LIFT OPERATION FOR BAG PLACMENT 4 BATTERY CHARGING 5 SAFETY 5 MAINTENANCE 6 REMOVING THE SLOT COVER 7 APPROVAL DRAWING 8 ELECTRICAL SCHEMATIC 9 CONTROL PANEL LAYOUT 9 SPARE PARTS LIST 11 WARRANTY 12 ...

Page 3: ...ions concerning the operation of this equipment please contact POST MATERIAL HANDLING 21 Stone Castle Road Rock Tavern NY 12575 845 200 3355 pat posthoist com DESCRIPTION PRINCIPLE OF OPERATION This equipment is designed to lift and position product bags over the Bosch Encapsulator A selector switch is located on the operator enclosure to control the UP DOWN motion of the machine Limit switches wi...

Page 4: ... is at a height where the bag can be placed on the lift 3 Turn the selector switch to the UP position to lift the bag to an appropriate height above the Bosch Encapsulator 4 Position the lift and bag over the discharge port on the Bosch Encapsulator 5 Turn the selector switch to the DOWN position to lower the bag to a point where it may discharge into the Bosch Encapsulator 6 Ensure the bag is sec...

Page 5: ...tacle 3 When the battery is fully charged Approximately 10 hours remove the electrical power cord SAFETY Do not operate the Post Lift if the maintenance schedule has not been followed Do not defeat any interlocks on the equipment This equipment is not designed to operate with any materials than originally specified and should not be used purposes other than what it was designed for The equipment s...

Page 6: ...earings and bushing of all articulating members for wear Replace as required Grease the roller track on a 6 month period Refer to the slot cover replacement instructions shown below Inspect the slot cover for wear and replace if necessary Inspect the roller chain and sprockets for wear Inspect post attachment bolts for tightness ...

Page 7: ... Rock Tavern NY 12575 www posthoist com 845 200 3355 REMOVING THE SLOT COVER 1 Remove the 8 screws on the front of the carriage 2 Raise the tray to remove it from the carriage 3 Remove the top plate The slot cover will come out with the top late ...

Page 8: ...POST MATERIAL HANDLING 21 Stone Castle Road Rock Tavern NY 12575 www posthoist com 845 200 3355 APPROVAL DRAWING ...

Page 9: ...POST MATERIAL HANDLING 21 Stone Castle Road Rock Tavern NY 12575 www posthoist com 845 200 3355 ELECTRICAL SCHEMATIC ...

Page 10: ...POST MATERIAL HANDLING 21 Stone Castle Road Rock Tavern NY 12575 www posthoist com 845 200 3355 CONTROL PANEL LAYOUT ...

Page 11: ...FUSE 6 3A TYPE 477 5X20MM 400ADC IC PK OF 5EA X8636 0 27 69 5 54 MAT1365 BATTERY LOW VOLTAGE DISCONNECT LVD FOR 24VDC LEAD ACID X8637 1 60 00 60 00 MAT2068 POTENTIOMETER 22MM 5K 0 5W X8971 1 38 97 38 97 MAT225 VARIABLE SPEED DC MOTOR CONTROLLER P N 9500 X9028 4 494 19 1 976 77 MAT144 LINEAR BEARING X8654 4 127 16 508 64 MAT144 LINEAR BEARING X8654 4 77 58 310 32 MAT160 SLOT COVER MCMASTER D30 1 5 ...

Page 12: ...tion unless installed by Seller loss of product or tampering in such a manner as to impair the normal operation of the equipment Seller guarantees to replace or at its option repair any equipment or components which are found to be defective in substance or workmanship within one year of date of delivery to Purchaser or completion of repairs or modifications Seller s obligation with respect to suc...

Reviews: