
GAM Quick Installation Guide
Positron Access Solutions
15
Document 180-0212-001 R02
Step 5:
install the fiber patch cable around the
fiber spool as per the fiber cable provider
guidelines. Make sure you have enough length
to reach the SFP cage while routing the fiber
cable above the 2 x RJ-45 ports at the top right
of the GAM enclosure.
Step 6:
insert the fiber connectors into the SFP
/ SFP+ module.
Note:
while an LC patch cable
is shown here, you can also use an SC patch
cable or a copper (CAT-5/6e) when using a
copper SFP.
Step 7:
make sure you carefully route the fiber
patch above and around the internal mini-COAX
cables.