NF802 Intelligent Relay Tester User Manual
19
4.2
IEC61850
“SMV”, “GOOSE subscription” and “GOOSE publish” showing in figure 4.2.1. Users can
configure SMV and GOOSE subscription and publish manually or automatically.
Figure 0.1 IEC configuration
①
Configuration switch zone: Open the required test configuration interface.
②
Control switch zone: Switch the required SMV/GOOSE settings.
③
Parameter setting zone: Set the present SMV/GOOSE messages.
④
Channel setting zone: Map the present SMV/GOOSE message channels.
⑤
Public parameter setting zone: Configure the same parameters.
⑥
Interface function zone: If there is a SCD or XML file, it will automatically configure the
messages and save it.