Procedure
To modify the USB Key settings:
1.
Take the USB Key from the Installation Accessories kit and insert it into the PC workstation.
In Windows XP:
• The
Polycom Documentation
option is automatically selected. Click
OK
.
In Windows 7:
• Select
Open Folder to view files using Windows Explorer
.
2.
Double-click the
index.hta
file.
3.
In the Language Menu window, click the documentation language hyperlink, for example
English
.
4.
In the Polycom End User Licenses Agreement window, read the agreement and click the
Accept
Agreement
button.
5.
In the
Product Type Selection
window, click the RealPresence Collaboration Server type
hyperlink, for example
RMX 2000
.
6.
Under the
Initial Setup Utility
, click the
LAN Configuration Utility
hyperlink.
7.
In the
LAN Configuration Utility
window, modify default IP addresses to IP addresses in your
local network provided by your network administrator.
•
Control Unit IP Address
(the Management IP address for the MCU)
•
Shelf Management IP Address
(only for RMX 2000/4000)
• Subnet Mask
• Default Router IP Address
8.
Click
OK
.
Power-up for the Collaboration Server First Time Using the USB Key
When inserting the USB in the RealPresence Collaboration Server, then powering up the server, the
modified network configurations in USB will upload to the server.
Procedure
To power-up for the Collaboration Server first time using the USB Key:
1.
Insert the USB Key containing the modified IP addresses in USB port the RealPresence
Collaboration Server 1800/2000/4000 back panel.
2.
Power the Collaboration Server ON.
• RealPresence Collaboration Server 1800: Press on the
ON/OFF
button on the front panel,
the
ON/OFF
button is light.
• RealPresence Collaboration Server 2000: Switch on the
ON/OFF
switch on the rear panel,
the
FAN STATUS
and
PWR STATUS LED
s are light.
• RealPresence Collaboration Server 4000 with AC power supply: Switch on the
ON/OFF
switch on the rear panel, the
FAN STATUS
and
PWR STATUS LED
s are light.
• RealPresence Collaboration Server 4000 with DC power supply: Switch on the
ON/OFF
switch on the rear panel, then turn on each of the DC PEMs, the
FAN STATUS
and
PWR
STATUS
LEDs are light.
When the system is powered on, the configurations in the
lan.cfg
file are uploaded from the
USB key to the memory of Collaboration Server and applied during the power-up
sequence.System power-up sequence may take up to five minutes.
3.
Wait for the upload process to complete by observing following LED status.
Appliance Edition Installation
Polycom, Inc.
31