
POLITEC s.r.l. | Manual PARVIS HYBRID SMA – Ver. 1.2
8
3.
BASE INSTALLATION ON CABLEPIT
Ensure that all the cables to and from the PARVIS tower passes through the supplied cable glands inserted into
the base cap. Use the central cable gland for lightning cable.
Base cover with the cable glands and O-ring
Once the cabling is completed the base cap has to be fixed to the base with relative O-ring.