
POLITEC s.r.l. | Manual PARVIS HYBRID SMA – Ver. 1.2
6
CABLE PIT POSITIONING
The placement of the cable pit for PARVIS columns, after assembling, have to be done in the following way:
cement all around the cable pit keeping the top edge of it at same level of ground.
For PARVIS columns is also possible to keep the top edge ten centimeters below the level of the ground so that
it is visible only the IR tube.
This type of placement is possible only when the cable pit is fixed into the ground and not in a concrete
pavement.