Summary of Contents for ALES QUAD 160

Page 1: ...PRODUCT ALES QUAD ALES QUAD Product code ALES QUAD 160 ALES QUAD 250 QUADRUPLE OPTIC PERIMETER BARRIER INSTALLATION AND MOUNTING MANUAL VERSION 1 2...

Page 2: ...tallation height 6 2 Placement and mounting 7 Evaluations before installation 9 7 1 Introduction to barriers 8 Barrier positioning 10 8 1 Precautions before installation 9 Wiring 11 9 1 Type of cable...

Page 3: ...smitter Operation is based on the AND logical operations in other words the alarm is activated only in the event of simultaneous interruption of two superimposed beams This barrier is ideal for perime...

Page 4: ...olitec there is no warranty for the end user who in the event of breakdowns or faults must contact the installer or dealer The warranty excludes aesthetic parts as well as parts subject to normal wear...

Page 5: ...rything has been included COMPONENT LIST 1 Polycarbonate black cover 9 AHTR thermostat control kit present on AQ250 2 Board cover 10 Gasket 3 Optics unit 11 Fixing plate stopper 4 Dis TRG dual optics...

Page 6: ...sal electronic board housing insert and connect the radio transmitter and connect it to the barrier receiver board c Power up the barriers and program them d Test barrier operation e Place without fix...

Page 7: ...action trees plants or objects that can swing or move with the wind or rain Position the barrier so that sunlight does not hit it directly near the RX sensors However it is necessary to take into cons...

Page 8: ...the plate with the screws provided Make the connections on the terminal board After checking the alignment and correct operation refit the cover and tighten the closing screw firmly Wall mounting wit...

Page 9: ...ultiple controls that significantly limit false alarms as the genuine alarm signal is given by the complete interruption of the infrared signal TX RX TX HEATERS It is recommended to power the thermost...

Page 10: ...e are plants bushes or fixed objects in the range that obstruct the signal and create grey areas Leave a corridor of 50cm for distances between columns greater than 50m TX RX TX RX DO NOT place barrie...

Page 11: ...aid The sizing of the cables depends on the consumption of the columns and on the resistance of the cable itself according to the distances involved The table shows the cable cross sections and the re...

Page 12: ...r shaped connection to avoid excessive voltage drops on the power cables The various examples shown here highlight the connection from the power supply to single columns however it can also be carried...

Page 13: ...metres can be made In the event of joints the braid and shield connections must also be restored N B Connect the power supply negatives of the common columns It is possible to carry out this procedure...

Page 14: ...f the lens Vertical orientation Horizontal orientation JOINT LOCKING SCREW N B Tighten the joint locking screw after the adjustment 10 1 Calibration using SMA system It is possible to improve the cali...

Page 15: ...1 DIP on the TX motherboard to enter the test with lower optic TX1 Orient the TX optic on the column towards the RX optic vertically and horizontally acting as explained above until you find the maxim...

Page 16: ...er optic TX2 Exit the test of the optic by setting to OFF the TEST 1 DIP on the TX motherboard Set to ON TEST 1 DIP of the TX motherboard and repeat the alignment procedure for the crossed calibration...

Page 17: ...ters on if present SL2 Low signal upper RX optic SL1 Low signal lower RX optic SYNC Very fast flashing side with RX optic inside and wired synchronism SLOW Fog disqualification AMASK Antimask ALM On i...

Page 18: ...ONFIGURATION LED INDICATORS POWER On if powered HTR Heaters on if present SYNC Very fast flashing side with RX optic inside and wired synchronism T2 TX2 upper optic in TEST T1 TX1 lower optic in TEST...

Page 19: ...connected in the AQ 250 version while it is optional in the AQ 160 version in this case connect the AHTR board with the cable provided and fix it at the bottom to each TX and RX column using the scre...

Page 20: ...e is increased up to 500ms In this condition the alarm of a person crossing the barrier while walking is guaranteed with the advantage of excluding the possibility of any false alarms e g animal cross...

Page 21: ...ing detection with other Infrared signal with outward signalling O C NO to GND OPERATING TEMPERATURE 25 C 70 C Heater kit available for temperatures down to 50 C ALIGNMENT ANGLES 20 Vertical 180 horiz...

Page 22: ...in the absence of fog Make sure that the power supply of the heaters is greater than 20 Vac at the barrier terminal board Check the alignment accuracy of each individual optic and if necessary carry...

Page 23: ...ter than 20 Vac at the barrier terminal board Use the shielded cable for separate power supply and synchronism by connecting the braid to the earth Check the correct sizing of the power cables 15 Prod...

Page 24: ...POLITEC INSTALLATION MANUAL VER 1 2 For technical support contact your security systems distributor...