FINAL DRIVE
7.24
REAR DRIVE SHAFT
INSTALLATION
1.
Slide shaft assembly into bearing carrier hub (A)
A
2.
Apply anti-seize compound to splines (B) of shaft.
3.
Install a new lock ring (C) and install the shaft.
C
B
4.
Lift bearing carrier into place and install bolt to
upper control arm. Torque bolt to 35 ft. lbs. (48
Nm).
5.
Install hub, flat washer, domed washer (domed
side out) and nut. Torque center nut to 100 ft. lbs.
(138 Nm). Install new cotter pin and hub cap.
6.
Install rear wheel and torque wheel nuts to
specification.
Out
Cone
Washer
Cone
washer
dome to
outside
100 ft. lbs.
(138 Nm)
Flat Washer
Rear Hub Nut Torque:
100 ft. lbs.
(138 Nm)
Rear Wheel Nut Torque:
20 ft. lbs.
(27 Nm)
7.
Grease all fittings thoroughly with Premium
U-Joint Lubricant.
Enfocus Software - Customer Support
Summary of Contents for SPORTSMAN 400 2003
Page 1: ...2003 SPORTSMAN 400 500 SERVICE MANUAL PN 9918065 The Way Out ...
Page 5: ......
Page 51: ...MAINTENANCE 2 32 NOTES ...
Page 71: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL A EH50PL ...
Page 131: ...BODY STEERING SUSPENSION 5 12 NOTES ...
Page 165: ...CLUTCH 6 34 NOTES ...
Page 193: ...FINAL DRIVE 7 28 NOTES ...
Page 217: ...TRANSMISSION 8 24 NOTES ...
Page 239: ...BRAKES 9 22 ...
Page 274: ...PN 9918065 Printed in USA ...