3.26
9850068 R01 - 2020-2021
RZR
PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.
6. Slowly apply pressure to the actuator, and watch the
indicator dial. Once the indicator dial has indicated a
displacement of .070″ (1.75 mm), observe the line
pressure reading after the air pressure regulator.
NOTICE
The intended actuator preload should result in a
displacement of .070″ (1.75 mm) at 7 PSI supplied air
pressure. Having a correctly preloaded actuator will
help ensure correct turbocharger response and boost
pressure.
MEASUREMENT
Actuator Preload
0.070” (1.75 mm) at 7 PSI (48.3 kPa)
7. To adjust actuator preload, start by loosening the two
(13mm) lock nuts on the actuator rod, keeping in
mind the actuator rod itself is a left hand thread.
8. Using the same method of applying air pressure to
the canister as previously mentioned, the large
turnbuckle can be turned to adjust actuator preload,
until the desired preload is met. This correct preload
will result in .070″ (1.75 mm) of displacement on the
wastegate flapper at a supplied pod pressure of 7
PSI. The nuts may be locked in place once again
using the (17mm) flats found on the actuator rod
turnbuckle.
NOTICE
The preload may change when the lock nuts are
torqued. Ensure the correct preload is still measured
after locking the actuator rod turnbuckle in place.
ACTUATOR POD REMOVAL
1. Locate the actuator rod heim joint, located opposite to
the actuator pod.
2. Holding the opposite 13mm hex nut, loosen the bolt
securing the heim joint with a 4mm Allen key.
3. Remove both pieces to free the Heim joint from the
assembly.
4. On the opposite end of the turbocharger, locate M6
10mm hex bolts that fasten the actuator pod bracket
to the compressor housing, as well as the boost
pressure reference hose on the top of the canister.
5. Remove the boost reference hose from the canister
pod.
6. Remove the two mounting bolts, and the actuator pod
assembly will be free from the turbocharger.
CAUTION
Do NOT hold turbocharger by the actuator rod. This
may result in serious damage to the turbocharger and
its components.
7. For assembly, reverse procedure. Torque fasteners to
specification.
TORQUE
Actuator Rod Heim Joint Fasteners:
7 ft-lb (10 Nm)
Summary of Contents for RZR PRO XP 2020
Page 3: ...REVISION INDEX REV DATE CHANGES R01 11 10 2020 Initial Release...
Page 6: ......
Page 587: ...Symptom and Occurrence Checklist BEEN PRESENT SINCE NEW 51...
Page 588: ......
Page 590: ......