9926813 R04 - 2013-2016
RZR
570 Service Manual
© Copyright Polaris Industries Inc.
5.19
NOTE
It is important that the same number and thickness of
washers are reinstalled beneath the spider during
assembly. Be sure to note the number and thickness of
these washers.
2. Inspect the Teflon™ coating on the moveable sheave
bushing.
Moveable Sheave Bushing Inspection:
Replace the cover bushing if more brass than Teflon is
visible on the bushing. Refer to bushing replacement in
this chapter.
ROLLER, PIN, AND THRUST WASHER
INSPECTION
Inspect all rollers, bushings and roller pins by pulling a
flat metal rod across the roller. Turn roller with your
finger. If you notice resistance, galling, or flat spots,
replace rollers, pins and thrust washers in sets of three.
Also inspect to see if roller and bushing are separating.
Bushing must fit tightly in roller. Use the Roller Pin Tool
e
to replace rollers and pins. Take care not to damage
roller bushing or bearing surface of the new pin during
installation.
e
2870910
Roller Pin Tool
BUTTON TO TOWER CLEARANCE
INSPECTION
1. Inspect for any clearance between spider button to
tower. If clearance exists, replace all buttons and
inspect surface of towers.
Button to Tower Clearance:
.000-.012”