6
Pub. No. OM-A-10E — April 2004
INSTALLATION & OPERATION
FIGURE 1 — COMPRESSED AIR SYSTEM RECOMMENDED INSTALLATION FLOW DIAGRAM
COMPRESSED AIR SYSTEM
RECOMMENDED INSTALLATION
FLOW DIAGRAM
PAR
PR
DIFFERENTIAL
PRESSURE GAUGE
DIFFERENTIAL
PRESSURE GAUGE
4
AFTERCOOLER
1
3
PLANT
AIR
-40
°
F TO
-100
°
F
PDP
R
-
RELIEF
VALVE
P - PRESSURE GAUGE
T - TEMPERATURE GAUGE
(REMOVES 66%
MOISTURE)
AIR COOLED
AFTERCOOLER
2
P
RECEIVER
T
C
PREFILTER
REGENERATIVE
AIR DRYER
PARTICULATE
AFTERFILTER
4
5
TO PLANT USE
37
°
°
°
F
RECEIVER
REFRIGERATED
COALESCING
AFTERFILTER
DRAIN
R
OPTIONAL 3 VALVE
SYSTEM BYPASS
P
6
P
CONTROL
(OPTIONAL)
AUTO
DRAIN
1.
SEE PNEUMATECH BULLETIN PWC-1
2.
SEE PNEUMATECH BULLETIN A-3
3.
SEE PNEUMATECH BULLETIN A-16
4.
SEE PNEUMATECH BULLETIN A-8
5.
SEE PNEUMATECH BULLETIN A-10
6.
SEE CONSERVAIR BULLETIN CA-200
44
AU
DIFFERENTIAL
PRESSURE GAUGE
DIFFERENTIAL
PRESSURE GAUGE
4
77
TO
AIN
3
AUTO
DRAIN
3