Pluribus Networks F9372-B-X Quick Start Manual Download Page 1

–  1  –

1. Unpack the Switch and Check Contents

F9372-T, F9372B-T, 

F9372-X or

F9372B-X 

Rack Mounting Kit—2 front-post brackets, 2 rear-post 

brackets, 20 screws, and 2 ear-locking screws

Power Cord (included with AC PSUs only)

Ground Wire (included with DC PSUs only)

Console Cable—RJ-45 to DB-9

DC Power Cable (included with 48 VDC PSU only)

Documentation—

Quick Start Guide

 (this document) 

and 

Safety and Regulatory Information

Note:

 The switch has the Open Network Install 

Environment (ONIE) software installer pre-loaded on the 

switch, but no switch software image.  Information about 

compatible switch software can be found at 

www.edge-core.com

.

Caution: 

The switch includes plug-in power supply (PSU) 

and fan tray modules that are installed into its chassis. All 

installed modules must have a matching airflow direction. 

That is, if the installed power modules have a front-to-back 

(F2B) airflow direction, all the installed fan tray modules 

must also have a F2B airflow direction. 

Note:

 The switch drawings in this document are for 

illustration only and may not match your particular switch 

model.

2. Attach the Brackets

Attach each of the front- and rear-post brackets to the 

switch using four of the included bracket screws.

Use an additional two screws to secure each of the rear-post 

brackets at the mid-point on the sides of the switch.

3

1

1

2

1

2

Use the screws and cage nuts supplied with the rack to 

secure the switch in the rack. 

Caution:

 Installing the switch in a rack requires two 

people. One person should position the switch in the rack, 

while the other secures it using the rack screws.

装置の吸排気に必要な領域を マニ ュ アル上に規定 し て
い る 。

3. Adjust Rear-Post Bracket Ears

Lock the position of the rear-post bracket ears using the 

included position-locking screws.
You can also adjust the rear-post bracket ears to fit different 

rack depths from 56 cm to 75 cm.

4. Ground the Switch

Ensure the rack is properly grounded and in compliance 

with ETSI ETS 300 253. Verify that there is a good electrical 

connection to the grounding point on the rack (no paint or 

isolating surface treatment).

Attach the grounding wire #14 AWG to the grounding point 

on the switch rear panel. Then connect the other end of the 

wire to rack ground. For details on grounding the switch 

with a 12 VDC PSU in an Open Rack, refer to the Edgecore 

ORSA-1U Open Rack Tray Set 

Installation Guide

.

Caution:

 The earth connection must not be removed 

unless all supply connections have been disconnected.

3

1

1

1

2

1

2

19-0029 rev A

www.pluribusnetworks.com

54-Port 10G/40G Fiber Ethernet Switch

F9372-T | F9372B-T | F9372-X | F9372-B-X

Quick Start Guide

Summary of Contents for F9372-B-X

Page 1: ...of the included bracket screws Use an additional two screws to secure each of the rear post brackets at the mid point on the sides of the switch 3 1 1 2 1 2 Use the screws and cage nuts supplied with...

Page 2: ...located on attached storage 2 1 1 2 3 2 1 4 1 3 2 4 1 1 1 Boot the switch Wait for the ONIE software to locate and execute the NOS installer and then wait for the installer to load the NOS software im...

Page 3: ...Input 36 75 VDC 16 A maximum DC Output 5 VDC 0 5 A 12 VDC 33 A 12 VDC PSU PSU 12V 650 DC Input 12 VDC from Open Rack busbar Regulatory Compliances Emissions EN 55032 2012 AC 2013 Class A AS NZS CISPR...

Page 4: ...PSU RJ 45 DB 9 DC 48 VDC PSU Open Network Installer Environment ONIE www edge core com PSU F2B F2B 2 3 1 1 2 1 2 3 56 cm 75 cm 4 ETSI ETS 300 253 14 AWG 12 VDC PSUs Edgecore ORSA 1U Open Rack Tray Se...

Page 5: ...SU 10 AWG 12 VDC PSU DC PSU 6 LED PSU1 PSU2 Diag LED 7 NOS 5 5e RJ 45 Mgmt NOS ONIE NOS NOS ONIE NOS ONIE NOS NOS 2 1 1 2 3 2 1 4 1 3 2 4 1 1 1 2 8 RJ 45 100 ohm 5 5e DAC SFP QSFP SFP QSFP 40GBASE CR4...

Page 6: ...2 VDC EN 55032 2012 AC 2013 Class A AS NZS CISPR 32 2013 Class A CISPR 32 2012 Class A EN 61000 3 2 2014 Class A EN 61000 3 3 2013 FCC Class A VCCI Class A CE Mark CCC GB 9254 2008 Class A BSMI EMI St...

Page 7: ...2 x2 x20 x2 AC PSU DC PSU RJ45 DB 9 DC 48 VDC PSU ONIE www edge core com F2B F2B 2 3 1 1 2 1 2 3 56 cm 75 cm 4 ETSI ETS 300 253 14 AWG 12 VDC PSU Edgecore ORSA 1U Open Rack Tray Set 3 1 1 1 2 1 2 54 1...

Page 8: ...VDC PSU 10 AWG 12 VDC PSU DC PSU 6 LED PSU1 PSU2 Diag LED 7 NOS 5 ohm 5 5e RJ 45 Mgmt NOS 2 1 1 2 3 2 1 4 1 3 2 4 1 1 1 ONIE NOS NOS ONIE NOS ONIE NOS NOS 8 RJ 45 100 ohm 5 5e DAC SFP QSFP 40GBASE CR...

Page 9: ...C 12 VDC EN 55032 2012 AC 2013 Class A AS NZS CISPR 32 2013 Class A CISPR 32 2012 Class A EN 61000 3 2 2014 Class A EN 61000 3 3 2013 FCC Class A VCCI Class A CE Mark CCC GB 9254 2008 Class A BSMI EMI...

Reviews: