IMPORTANT NOTES: Read First
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
TRANSITION WALL
INSTALLATION INSTRUCTIONS
Rev J
8/19/2020
1310
Page 1 of 3
See Installation Manual
Sections 09 Collars
and 11 Clamps
Figure 1.1
Figure 1.2
(A)
Use liquid thread lock (such as Loctite
®
) with all threaded hardware.
Important:
Liquid thread lock (prior to
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B)
Refer to Installation Manual for 09 Collars and 11 Socket Clamps assembly instructions.
(C)
Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate
for the fall height of the equipment or consult you surfacing supply representative.
NOTE
: R5 Single Tab Transition Wall
shown. Other configurations will vary
slightly but do not affect assembly.
FIGURE 1
Transition Wall