IMPORTANT NOTES: Read First
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
GEO-WAVE CLIMBER HORIZONTAL
1249-DDH \-DGH
Page 1 of 6
Rev C
: R5 Configurations shown. R3.5 will vary
slightly, but does not affect the assembly.
Deck to Deck Mount
FIGURE 2
NOTE
FIGURE 1
Deck to Ground Mount
(A) Use liquid thread lock (such as Loctite
®
) with all threaded hardware. Important: Liquid thread lock (prior to
curing helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C) Refer to Installation Manual for 09 Collars, 11 Socket Clamps, and 1309 Half Wall assembly instructions.
(D) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate
for the fall height of the equipment or consult you surfacing supply representative.
1.1 & 1.3
1309 Half Wall
See Installation Manual Section
09 Collars and 11 Clamps
See Installation Manual Sections
1.2 & 1.4
Figures
Figures
See Footing Detail