background image

IMPORTANT NOTES: Read First

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

GEO-WAVE CLIMBER HORIZONTAL

1249-DDH \-DGH

Page 1 of 6

Rev C

: R5 Configurations shown. R3.5 will vary 

slightly, but does not affect the assembly.

Deck to Deck Mount

FIGURE 2

NOTE

FIGURE 1

Deck to Ground Mount

(A) Use liquid thread lock (such as Loctite

®

) with all threaded hardware. Important: Liquid thread lock (prior to 

curing helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a 
lubricant during assembly.

(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be 
allowed to cure completely before using the equipment (at least 72 hours).

(C) Refer to Installation Manual for 09 Collars, 11 Socket Clamps, and 1309 Half Wall assembly instructions.

(D) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication - 
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate 
for the fall height of the equipment or consult you surfacing supply representative.

1.1 & 1.3

1309 Half Wall

See Installation Manual Section

09 Collars and 11 Clamps

See Installation Manual Sections

1.2 & 1.4

Figures

Figures

See Footing Detail

Reviews: