background image

Date:04/13/22

PAGE 1

INSTALLATION MANUAL

5960SP

Summary of Contents for GameTime VistaRope 5960SP

Page 1: ...Date 04 13 22 PAGE 1 INSTALLATION MANUAL 5960SP ...

Page 2: ...cked Soil or Gravel Fill ASTM Use Zone Foundation Construction 1 Follow Instructions to Assemble Base and Nets 2 Carefully Lift Assembly into excavated hole 3 Level and backfill with gravel or hard packed soil 4 Install surfacing 3 6 FOOTERS AND USE ZONE ...

Page 3: ...an 2 Connect the Upper Net to the top of the Post as shown 3 Attach the Spider Net to the Post PAGE 3 5960SP UPPER NET ASSEMBLY Upper Net Upper Net Post Assembly Post Assembly Spider Net Spider Net M6 Barrel Nut and M6 Barrel Nut and Bolt Bolt M6 Barrel Nut and M6 Barrel Nut and Bolt Bolt ...

Page 4: ...per Net and the Spider Net M8 X 55 Bolt M8 X 55 Bolt M8 X 33 Barrel Nut and Washer M8 X 33 Barrel Nut and Washer Plastic Joint Plastic Joint Sleeve Sleeve Ring Section Ring Section PAGE 4 5960SP UPPER RING ASSEMBLY M6 Barrel Nut and M6 Barrel Nut and Bolt Bolt ...

Page 5: ...e Lower Net to the Ring 2 Assemble the Base Plate and Angle Braces to the Post Assemblty M12 X 35 Bolt M12 X 35 Bolt nut washer nut washer Angle Brace Angle Brace Base Plate Base Plate PAGE 5 5960SP BASE ASSEMBLY ...

Page 6: ...1 Carefully lift the Assembly and place in the foundation hole 2 Level the Post Assembly and backfill with hard packed soil or gravel Sand is not recommended PAGE 6 5960SP INSTALL BASE ...

Page 7: ...at no more than 2 threads protrude beyond the nut Plastic Joint Plastic Joint Sleeve Sleeve M8 X 70 Bolt M8 X 70 Bolt M8 X 33 Barrel M8 X 33 Barrel Nut and Washer Nut and Washer Top Flange Top Flange M8 X 55 Bolt and M8 X 55 Bolt and Washer Washer Bottom Flange Bottom Flange M8 X 55 Bolt M8 X 55 Bolt M8 X 33 Barrel M8 X 33 Barrel Nut and Washer Nut and Washer M12 X 35 Bolt M12 X 35 Bolt M12 Nylon ...

Page 8: ... before installing the Top Flange Assemble the Deck sections between the Bottom Flange and the Lower Ring Use the M8 X 55 Bolts in the Top Flange to help align the Deck sections Temporarily use M8 X 55 Bolts to aid Temporarily use M8 X 55 Bolts to aid alignment alignment Leave ropes disconnected to insert Floor Leave ropes disconnected to insert Floor Decks Decks Top Flange Top Flange PAGE 8 5960S...

Page 9: ...M8 Bolts M8 Bolts Post Cap Post Cap Eyebolt Eyebolt 1 IMPORTANT After placement be sure to remove the Eyebolt 2 Install the Post Cap with 3 M8 Bolts PAGE 9 5960SP CAP ASSEMBLY ...

Page 10: ...1 Outer Post 2 Inner Post 3 Upper Net 4 Lower Net 5 Spider Net 6 Upper Ring 7 Lower Ring 8 Eyebolt 9 Post cap 10 M8 Bolt 1 1 2 2 3 3 4 4 5 5 6 6 7 7 10 10 8 8 9 9 PAGE 10 5960SP PARTS LIST 1 ...

Page 11: ...el Nut and Washer 16 M6 X L20 Barrel Nut 17 M6 X L19 Barrel Nut 18 Base 19 Angle Brace 20 M12 X L35 Bolt 21 M12 Nut and Washer 22 Upper Flange 23 Plastic Joint Sleeve 24 Floor Deck 22 22 24 24 22 22 14 14 11 11 12 12 13 13 15 15 1 1 21 21 15 15 14 14 15 15 20 20 19 19 18 18 20 20 21 21 PAGE 11 5960SP ...

Page 12: ...allation is correct complete and re inspect ed Protective Surfacing Make sure appropriate playground surfacing has been installed to meet applicable standards Remove All Assembly Aids Please make sure that all tools and assembly aids have been removed from the playing area before opening for play PAGE 12 5960SP AFTER INSTALLATION BEFORE OPENING FOR PLAY RECOMMENDATIONS ...

Page 13: ...ter the inspection staff should do preventive maintenance and repairs and or re move damaged equipment to remedy problems discovered in the inspection High Frequency Inspections Often performed daily or weekly high frequency inspec tions look at frequently changing conditions caused by use weather and or vandalism During a high frequency inspection staff checks and corrects playground conditions s...