1 Overview of tool stations and assignment
2 Edit tool stations
3 Tool information
13.4.1 Overview of tool stations and assignment
This overview shows the assignment of tools to the tool stations. In addition,
the tool status and remaining run time are displayed.
The remaining run time is shown both as a pie chart (%) and in the form of
a countdown (hours and minutes). The colour of the pie chart can be green
(> 40 % run time left), yellow (10-40 % run time left) or red (< 10 % run time
left).
13 Control software
42 Planmeca PlanMill 60 S
User's manual