background image

5

2.2 Switch Front Panel Layout

Figure 2-1 shows the front panel of the Industrial Managed Switch.

LNK/ACT

LNK/ACT

PoE

LNK/ACT

PoE

FAULT

PWR 2

PWR 1

R.O.

Ring

V2
V2

V1
V1

INPUT

DC 48-56V

1

3

5

2

4

6

1

2

5

6

4

8

7

3

Pin Con

1

DA+

2

DA

5

DC

8

DD

3

DB+

6

DB

7

DD+

4

DC+

IGS-604HPT-M12

IP67

PoE

Mgt.

M12 Gigabit

Ethernet Port

M12 Power

Input Connector

Power, Fault,

Ring LEDs

M12 Gigabit

Ethernet

PoE+ Port

Figure 2-2: 

 IGS-604HPT-M12 Front Panel

2.3 LED Indicators

 System

LED

Color

Function

PWR 1 Green Lights to indicate DC power input 1 has power.
PWR 2 Green Lights to indicate DC power input 2 has power.
Fault

Red

Lights to indicate that the Industrial Switch has failed

Ring

Green

Lights to indicate that the ERPS Ring has been created 
successfully.

R.O.

Green

Lights

To indicate the Ring Owner has been enabled and the 
state is in idle mode.

Blinks To indicate the Ring state is in protect mode.
Off

To indicate that the Ring Owner hasn’t been enabled.

 Per 10/100/1000BASE-T Port (Port 1~2)

LED

Color

Function

LNK/ACT Green

Lights

To indicate the port is running in 10/10/1000Mbps 
speed and successfully established.

Blinks

To indicate the switch is actively sending or receiving 
data over that port.

Summary of Contents for IGS-604HPT-M12

Page 1: ...Industrial IP67 rated 4 Port 10 100 1000T 802 3at PoE 2 Port 10 100 1000T M12 Managed Ethernet Switch 40 75 degrees C IGS 604HPT M12 Quick Installation Guide...

Page 2: ...Male to RJ45 8 pin Straight through UTP Cable Wiring 6 2 6 M12 DC Power Connector Pin Assignment 8 2 7 M12 DC Power Cable Wiring 8 3 Connecting M12 Cable to the IGS 604HPT M12 9 4 Switch Management 1...

Page 3: ...Open the box of the Industrial Managed Switch and carefully unpack it The box should contain the following items 1 x The Industrial Managed Switch 1 x Quick Installation Guide 1 x 2m 8 pin A code M12...

Page 4: ...4 2 Hardware Introduction 2 1 Physical Dimensions...

Page 5: ...ts to indicate DC power input 1 has power PWR 2 Green Lights to indicate DC power input 2 has power Fault Red Lights to indicate that the Industrial Switch has failed Ring Green Lights to indicate tha...

Page 6: ...e connected device is not a PoE powered device PD 2 4 M12 10 100 1000T Connector Pin Assignment The Industrial Managed Switch front panel provides six 10 100 1000BASE T Ethernet ports in the form of M...

Page 7: ...erwise the Ethernet performance will be poor Note The standard RJ45 receptacle connector There are 8 wires on a standard UTP STP cable and each wire is color coded The following shows the pin allocati...

Page 8: ...female connector from the Industrial Managed Switch package for DC power input The M12 DC power cable pin assignment is shown below M12 DC power cable pin assignment wire code V1 positive pin black ca...

Page 9: ...the waterproof screw nuts of an M12 connector and power input Step 2 Insert the M12 UTP male connector into the M12 female Gigabit Ethernet port of the Industrial Managed Switch Step 3 Turn clockwise...

Page 10: ...rt of the power input Step 5 Turn clockwise to tighten the screw nut of the M12 power connector Note Before connecting the DC power cord please check whether your local DC power source is stable Note...

Page 11: ...Industrial Managed Switch is not accessible please turn off the anti virus soft ware or firewall and then try it again 4 2 Starting Web Management The following shows how to start up the Web Managemen...

Page 12: ...nterface 2 When the following dialog box appears please enter the default user name and password admin The login screen in Figure 4 1 appears Default IP Address 192 168 0 100 Default Username admin De...

Page 13: ...can use the Web management interface to continue the Switch management Please refer to the user s manual for more details 4 4 Saving Configuration via Web In the Industrial Managed Switch the running...

Page 14: ...hanges and set the current configuration as a startup configuration the startup configuration file will be loaded automatically across a system reboot 1 Click System Save Startup Config 2 Press the Sa...

Page 15: ...ustrial Managed Switch and 6 LNK ACT LEDs will be lit 4 Resetting Industrial Managed Switch to the factory default is done when 6 LNK ACT LEDs are lit again 5 Remove the RJ45 cable from port 1 and por...

Page 16: ...anet com tw en support faq php type 1 Switch support team mail address support_switch planet com tw IGS 604HPT M12 User s Manual http www planet com tw en support download php type1 22153 model 48896...

Reviews: