Planet IGS-5227-4MP2MT Quick Installation Manual Download Page 1

Industrial IP67-rated

4-Port 10/100/1000T 802.3at PoE

+ 2-Port 10/100/1000T

Managed Ethernet Switch (-40~75 degrees C, 24V)

IGS-5227-4MP2MT

Quick Installation Guide

Summary of Contents for IGS-5227-4MP2MT

Page 1: ...Industrial IP67 rated 4 Port 10 100 1000T 802 3at PoE 2 Port 10 100 1000T Managed Ethernet Switch 40 75 degrees C 24V IGS 5227 4MP2MT Quick Installation Guide ...

Page 2: ...ed Male to RJ45 8 pin Straight through UTP Cabling 5 4 Connecting M12 Cable to the Industrial Managed Switch 6 5 M23 DC Power Cable Pin Assignment 9 6 Requirements 10 7 Starting Web Management 11 8 Saving Configuration via Web 14 9 Recovering Back to Default Configuration 15 10 Customer Support 16 ...

Page 3: ...Installation Guide Open the box of the Industrial Managed Switch and carefully unpack it The box should contain the following items The Industrial Managed Switch x 1 Quick Installation Guide x 1 2m 8 pin A coded M12 to RJ45 UTP Cable x 1 DIN Rail Kit x 1 Wall mount Kit x 1 If any item is found missing or damaged please contact your local reseller for replacement ...

Page 4: ...rts in the form of M12 8 pin A coded female connector These ports are designed for Ethernet equipment connection through Cat5 5e UTP cables The M12 8 pin A coded input interface pinout is shown below Pin Con 1 DA 2 DA 5 DC 8 DD 3 DB 6 DB 7 DD 4 DC 1 2 5 6 4 8 7 3 8 pin M12 A coded Female 10 100 1000T Connector Pin Assignment ...

Page 5: ... 1 2 BI_DA orange 2 3 BI_DB white green 3 4 BI_DC blue 4 5 BI_DC white blue 5 6 BI_DB green 6 7 BI_DD white brown 7 8 BI_DD brown 8 Note As each Ethernet port of the Industrial Managed Switch is running in auto negotiation mode make sure the Ethernet ports of the corresponding Ethernet devices are also running in auto negotiation mode otherwise the Ethernet performance will be poor ...

Page 6: ...rial Managed Switch Step 1 Turn counterclockwise to remove the waterproof screw nuts of an M12 connector and M23 power input Step 2 Insert the M12 UTP male connector into the M12 female Gigabit Ethernet port of the Industrial Managed Switch ...

Page 7: ...he screw nut of the M12 connector and make sure the connection is tight Step 4 Insert the M23 power female connector into the M23 male port of the power input Note The box doesn t contain the M23 5 pin A coded female connector power cable ...

Page 8: ... to tighten the screw nut of the M23 power connector Note Before connecting the DC power cord please check whether your local DC power source is stable Note Make sure to tightly close all interfaces to have waterproof effect ...

Page 9: ...t your local reseller to purchase CB M23F5F 120 from PLANET V2 V2 V1 V1 CB M23F5F 120 M23 DC power cable pin assignment and wiring code V2 V2 V1 V1 V1 positive pin white cable V1 negative pin brown cable V2 positive pin black cable V2 negative pin yellow cable Note A Make sure you connect the correct power pin to your DC power source 1 The wire gauge for the power cable should be in the range of 1...

Page 10: ...ard Ethernet Port Connection Network cables Use standard network UTP cables with RJ45 connectors The above PC is installed with Web browser and JAVA runtime environment plug in Note It is recommended to use Internet Explore 8 0 or above to access the Industrial Managed Switch If the Web interface of the Indus trial Managed Switch is not accessible please turn off the anti virus software or firewal...

Page 11: ...nager PC must be set to the same IP subnet address For example the default IP address of the Industrial Managed Switch is 192 168 0 100 then the manager PC should be set to 192 168 0 x where x is a number between 1 and 254 except 100 and the default subnet mask is 255 255 255 0 PC Workstation with Web Browser 192 168 0 x Industrial Managed Switch RJ45 UTP Cable IP Address 192 168 0 100 Figure 7 1 ...

Page 12: ... access the Web interface 2 When the following dialog box appears please enter the default user name and password admin The login screen in Figure 7 2 appears Default Username admin Default Password admin Figure 7 2 Login Screen 3 After entering the password the main screen appears as Figure 7 3 shows Figure 7 3 Web Main Screen of Industrial Managed Switch ...

Page 13: ...ed Switch provides Figure 7 4 Switch Menu Note If you are not familiar with Switch functions or the related param eter press Help icon anytime on the Web page to get the help description Now you can use the Web management interface to continue the Switch management Please refer to the user s manual for more details ...

Page 14: ...RAM to FLASH by executing save startup config command so that the running configuration sequence becomes the startup configuration file which is called configuration save To save all applied changes and set the current configuration as a startup configuration the startup configuration file will be loaded automatically across a system reboot 1 Click System and Save Startup Config 2 Press the Save C...

Page 15: ...oop topology as shown below 3 Power on the Industrial Managed Switch and 6 LNK ACT LEDs will be lit 4 Resetting Industrial Managed Switch to the factory default is done when 6 LNK ACT LEDs are lit again 5 Remove the RJ45 cable from port 1 and port 2 6 Reset the Industrial Managed Switch to Factory Default configuration The Indus trial Managed Switch will then reboot and load the default settings a...

Page 16: ...w planet com tw en support faq php type 1 Switch support team mail address support_switch planet com tw IGS 5227 4MP2MT User s Manual http www planet com tw en support download php type1 22153 model type 3 Please select your switch model name from the drop down menu of Product Models Copyright PLANET Technology Corp 2017 Contents are subject to revision without prior notice PLANET is a registered ...

Reviews: