
34
➢
S. fig. below
2.3.1 Installation steps
1.
Find a suitable position for the extractor hood on the wall. Drill three Ø 8 mm
holes in the wall to attach the wall bracket. Insert the enclosed dowels into the
drill holes and fix the bracket to the wall using the screws (ST4*30mm) (s. fig.
below). Ensure that all screws are tightened and that the bracket is anchored in
the wall properly.
1
Drill holes (Ø 8 mm)
2
Dowels
3
Wall bracket
4
Screws (ST4*30 mm)
2.
Drill two additional Ø 8 mm holes for the dowels and screws by which the
extractor hood can be fixed after hanging up (s. fig. below).