21
/124
EN
21
/60
This manual belongs to PIUSI S.p.A. The reproduction of all or parts is prohibited.
CUBE
EN (translated from Italian)
14.2 STATION FIXING
Before starting installation, check that any packaging materials have not been trapped in the pipes.
Prepare suitable support clamps or fixing brackets according to the position in which you want to fix
CUBE B.SMART. The pipe coming from the tank must be aligned with the threaded inlet of the pump
filter, located under CUBE B.SMART.
TANK ABOVE
GROUND
MAX.
MIN.
Hp
TANK UNDERGRO
UND
Hp
MAX.
MIN.
Summary of Contents for CUBE B.SMART
Page 1: ...CUBE Bulletin M0546 EN_01 Installation use and maintenance EN ...
Page 2: ...Installation use and maintenance M0546 2 60 Bulletin M0546 ENGLISH ...
Page 56: ...Installation use and maintenance M0546 56 60 24 EXPLODED VIEWS ...
Page 58: ...Installation use and maintenance M0546 58 60 note ...
Page 59: ......