Transport Envelope Setup (Xport Setup)
Note:
This setup is used only when the envelope flap measure 3/4-inch (19 mm) or less.
When the friction feeder is armed (material is ready to feed) the envelope is not driven out far enough. It
prevents the pushers from hitting or opening the envelope flap.
To adjust the transport envelope setup:
1. Log in as Key Operator access level or higher.
2. Click the desired Feeder object on the main DC screen and select
Setup
from the drop-down.
3. Click the
Xport Setup
tab.
4. Select the
Flap first, short-flap return envelope
checkbox.
5. Click
OK
.
Operator Adjustments
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 153 of 288
Summary of Contents for Epic
Page 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Page 32: ...This page intentionally left blank ...
Page 193: ......
Page 224: ...This page intentionally left blank ...
Page 236: ...This page intentionally left blank ...
Page 250: ...This page intentionally left blank ...