73
The figure illustrates the one-sided PDK-4002 fixture.
The PDK-4003, which is double-sided, is assembled and installed in the same manner.
Mounting standard metal fixtures (PDK-4002)
Pattern paper
Ceiling flange
COMP
Flat washer
[WC100FZK]
Spring washer
[WS100FZK]
Hexagonal socket head
bolt (M10
×
85)
[SME100H850FZK]
Hexagonal socket head
bolt (M8
×
75)
[SME80H750FZK]
Spring washer
[WS80FZK]
Flat washer
[WC80FZK]
Hexagonal socket head
bolt (to eliminate
backlash) (M6
×
10)
[SME60H100FZK]
Monitor frame
Cable holes
Spacer
Support COMP
Center rod
Monitor bracket
Hole cover
Use this hole cover to hide
the machined hole in the
suspended ceiling.
Hexagonal socket head
bolt (to eliminate black
lash) (M5
×
16)
[SME50H160FZK]
Hexagonal socket head
bolt (for tilt adjustment)
(M6
×
10)
[SME60H100FZK]
Summary of Contents for PDA-4002
Page 5: ...5 Features ...
Page 21: ...21 Installation procedure ...
Page 57: ...57 Special installation Installation under the floor ...
Page 69: ...69 Mounting standard metal fixtures PDK 4001 ...
Page 75: ...75 Mounting standard metal fixtures PDK 4002 ...
Page 81: ...81 Mounting standard metal fixtures PDK 4004 ...
Page 131: ...131 Mounting standard metal fixtures Precautions for installing the optional speaker ...
Page 135: ...135 Before making adjustments ...