
PIN-M-02 DPMRA01.A Service Manual
Copyright © Pinssar (Aust) Pty Ltd 2019. The PINSSAR logo is a registered trademark of Pinssar Pty Ltd
Page 25 of
96
6. Carefully loosen the measurement chamber and tilt to gain access to the
lower silicon vacuum tube fitted to the opposite air hose nipple on the
measurement chamber.
F
IGURE
10
-
M
EASUREMENT
C
HAMBER AND
A
SSOCIATED
C
ONNECTIONS
7. Remove the silicon vacuum tube from the air hose nipple on the opposite side
of the chamber, using the previously explained methodology (see step 4).
8. Package the used measurement chamber with the same packaging as
provided for the replacement measurement chamber and return to the
manufacturer.
Install
1. Reconnect the lower air hose.
2. Connect two cables running from DPM Carrier board to Laser Amplifier board.
3. Place Laser chamber assembly in position.
4. Secure with three screws.
5. Reconnect the upper air hose
6. RTV the connectors on the Amplifier board.
7. Resecure wiring with cable tie.
8. Enter the calibration coefficient printed on the plate on the laser camber as the
fCalibrationValue on the SYSTEM SETPOINTS page in the HMI screen (see
Figure 11) to maintain the calibration of the DPM Reader with the new laser
chamber. Refer to section 11.1 for detailed instructions on how to access and
update the Red Lion HMI.
Grounding Cable
Amplifier Cables
Upper Air Hose
Lower Air Hose
Mounting Screws