INFORMATION
The check following modifications may only be carried out by qualified per-
sonnel.
7.5.1.3
Regular check
Safeguards must undergo a regular function test:
}
After switching on the supply voltage for the first press stroke
}
At least every 30 hours
NOTICE
The safety-related control system must request these regular inspections of
the safeguard via a user program.
INFORMATION
Trained operators must be used for the daily check.
Depending on the level of use, safety devices and safety measures on the press brake
must be checked at least once a year by an appointed expert (competent person) to ensure
they are in a safe condition. The result of these tests must be entered in the inspection
book or in the machine file. Any serious non-conformances must be rectified before the
press brake is returned to operation.
INFORMATION
The annual inspection may only be carried out by qualified personnel.
7.5.1.4
Prepare for function test
Proceed as follows:
}
During initial commissioning the press brake is fully configured with the upper tool (max-
imum weight).
}
Transmitter and receiver are correctly aligned (see "Initial commissioning").
}
The press brake is at top dead centre.
}
Transmitter and receiver are ready for operation.
}
Standard protected field mode is selected.