
PSEN opII4H Series
Operating Manual PSEN opII4H Series
1003501-EN-02
32
}
For PELV power supplies
Connect the power supply circuit to the earth conductor.
Commissioning
System connection
Make sure that the selected evaluation device has the following properties:
}
2-channel with feasibility monitoring
}
OSSD signals are evaluated
}
A test pulse lasting no longer than 300 µs is bridged
Suitable Pilz evaluation devices are, for example:
}
PNOZelog for monitoring safety light grids
}
PNOZsigma for monitoring safety light grids
}
PNOZ X for monitoring safety light grids
}
PDP67 ION and PDP67 ION HP
Make the connection using one of the cables listed in the order reference (see
reference for accessories, connection to PDP67 [
).
}
PNOZmulti for safety light grid monitoring
Configure the safety light grid in the PNOZmulti Configurator with switch type 3.
}
Automation system PSS 4000 for monitoring safety light grids with the FS_LightCurtain
function block
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Connect the evaluation device according to the specifica-
tions in the selected evaluation device’s operating manual.