
8-1
8.1
Technical details
8
Technical details
8
8000
Technical details
Technical details
8-
8.1
Technical details
8100
Technical details
8-
][Technische Daten_multi_Basis_Multi_2
Technical details
Electrical data
Module's current consumption
39 mA
Module's power consumption
1.0 W
Infeed for
Supply to the SC outputs
Supply voltage
24 VDC
Voltage tolerance
-20 %/+25 %
Max. continuous current that the external power supply
must provide
8.0 A
Potential isolation from system voltage
yes
Type of potential isolation
Basic insulation
Rated surge voltage
2500 V
Max. power dissipation of the module
4.50 W
Inputs
Number
8
Potential isolation from system voltage
no
Input voltage in accordance with EN 61131-2 type 1
24 V DC
Input current at rated voltage
5 mA
Input current range
2.5 - 5.3 mA
Pulse suppression
0.5 ms
Maximum input delay
8 ms
Semiconductor outputs
Number of positive-switching single-pole semiconductor
outputs
4
Potential isolation from system voltage
yes
Type of potential isolation
Basisisolierung
Rated surge voltage
2,500 V
Voltage
24 V DC
Output current
2.00 A
Output current range
0.00 - 2.50 A
Max. transient pulsed current
12 A
Short circuit-proof
yes
Residual current (I
r
)
0.05 mA
Max. internal voltage drop
500 mV
Max. duration of off time during self test
330 µs
Permitted loads
inductive, capacitive, resistive
Max. capacitive load
1 µF
Environmental data
Ambient temperature
0 - 60 °C
Forced convection off in control cabinet
55 °C
Storage temperature
-25 - 70 °C
Climatic suitability in accordance with standard
EN 60068-2-30, EN 60068-2-78
Condensation
not permitted
Max. operating height above sea level
<2000 m
EMC
EN 61131-2
Vibration to EN 60068-2-6
Frequency
5.0 - 150.0 Hz
Max. acceleration
1g
Airgap creepage in accordance with EN 61131-2
Overvoltage category
II
Pollution degree
2
Summary of Contents for PNOZ m EF 8DI4DO
Page 8: ...1 Introduction 1 4...
Page 14: ...3 Safety 3 4...
Page 16: ...4 Function description 4 2...
Page 18: ...5 2 Dimensions 5 Installation 5 2 5 2 Dimensions 5200 Dimensions 5 Abmessungen 22 5 0 88...
Page 20: ...5 Installation 5 4...
Page 24: ...6 Commissioning 6 4...
Page 26: ...7 Operation 7 2...
Page 32: ...8 Technical details 8 6...