70
DIV
AL 600
EN
Use, maintenance and warning instructions
MEDIUM PRESSURE REGULATOR
|
COMMISSIONING
|
REV. A
8.5 - REGULATOR COMMISSIONING PROCEDURE
In the application consisting of two pressure adjusting lines, it is advisable to commission one line at a time, starting with
the line with the lowest set point.
The set point value is mentioned on the test certificate enclosed with each piece of equipment.
Fig. 8.16. Commissioning the DIVAL 600 regulator
Summary of Contents for Dival 600
Page 156: ...TM0023ENG...