58
GOVERNORS NOR
TH AMERICA
US
LOW PRESSURE GAS REGULATOR
|
TRANSPORT AND HANDLING
|
REV. A
Operation, maintenance and warning manual
5.4 - UNPACKING
Packing removal
Operator qualification
• Installer.
PPE required
The PPE listed in this chart relates to the risk associated with the equipment.
For the PPE necessary to protect against risks associated with the workplace or
operating conditions, refer to:
•
the regulations in force in the country of installation;
• any indications provided by the Safety Manager at the installation facility.
Tab. 5.33.
To unpack the equipment in the cardboard box, proceed as specified in Tab.5.34:
Step Operation
Image
1
Remove the straps (A).
B
A
A
A
2
Remove the packing box (B).
3
Remove the clips that secure the equipment to the base (when
present).
4
Move the equipment from the base to the place intended for it.
To manually handle the packages, if their size/weight
requires it, employ at least 2 operators.
Tab. 5.34.
After removing all packing materials, check for any anomalies.
In the presence of anomalies:
•
do not perform the installation operations;
•
contact PIETRO FIORENTINI S.p.A. communicating the data shown on the identification plate of the
equipment.
5.4.1 - PACKAGING DISPOSAL
Separate the various materials making up the packaging and dispose of them in compliance with the reg-
ulations in force in the country of installation.
Summary of Contents for 30051
Page 98: ...TM0061USA ...