Start-Up
2
Start-Up
2.1
Mechanical Mounting
NOTE
If the counter-sunk mounting holes in the stage base are covered by the
platform, you must first move the platform to a position which allows
access. Read "Moving the Stage (p. 11)" for instructions.
Figure 3: M-ounting hole locations on stage, identical for all models
To mount an M-403 stage on a base plane, use the two holes for M6 screws
or the four counter sunk holes for M4 screws in the stage base and the
corresponding mounting screws which come with the stage. The
arrangement of the M6 holes complies with the 25 mm-hole pattern of
standard metric honeycomb tables.
You have best access to the M6 mounting holes, when the platform is at its
central reference switch (for reaching the reference position see the User
Manual of the motor controller used).
www.pi.ws
M-403 MP 73E Release 2.0.1 Page
9