![PI L-505.013212 User Manual Download Page 24](http://html1.mh-extra.com/html/pi/l-505-013212/l-505-013212_user-manual_1554407024.webp)
8
Maintenance
NOTICE
Damage due to improper maintenance!
Improper maintenance can lead to misalignment and failure of the L-505.013212.
►
Loosen screws only according to the instructions in this manual or the instructions of our
customer service department (p. 29)
8.1
Maintenance Run
The maintenance run serves to distribute the existing lubricant.
The following intervals for the maintenance run depend on the operating conditions and the
period of use:
■
After 500 operating hours or at least after one 1 year
■
If the L-505.013212 is moved over a small travel range (<20 % of the entire travel range)
during industrial operation: After every 2000 motion cycles
Performing a Maintenance Run
1. Make sure that collisions between the L-505.013212, the load to be moved, and the
surroundings are not possible over the entire travel range of the L-505.013212. If
necessary, remove the load from the motion platform of the L-505.013212 for the
maintenance run.
2. Perform a maintenance run over the entire travel range:
a) Command the L-505.013212 to the end of a travel range and from there to the opposite
end of the travel range (see manual for the electronics).
b) If necessary: Command the L-505.013212 to a position, where the load can be mounted
onto the motion platform again and
mount the load back onto the L-505.013212 (p. 20)
8.2
Relubricating
Overview
1
2
1
Figure 7: Elements of the L-505.013212 with lubrication
1. Guides
8 MAINTENANCE
L505M0008EN
‒
6/17/2020
24
M O T I O N | P O S I T I O N I N G