phase II+ SRG-2000 Instruction Manual Download Page 4

 

21 Industrial Ave  

  Upper Saddle River, NJ. 07458 

Tel: (201)962-7373  

  Fax: (201)962-8353 

E-mail: 

[email protected]

   

  WebSite:  

http://phase2plus.com

   

 

4

 
 
 

 

 

FIGURE 2: STRUCTURE OF MAINFRAME 

 

 

 

 

1)

 

Start

 

Test

 

Button

  

 

2)

 

Lcd

 

Screen

 

3)

 

Scale

 

Selection

 

/

 

Up

 

 

4)

 

Inch/Metric

 

Conversion

 

/

 

Down

 

5)

 

Power

 

Switch

 

 

 

6)

 

Charging

 

Socket

 

7)

 

Stylus

 

Mark

  

 

 

8)

 

Stylus

 

Protective

 

Guard

 

 

 
 
 
 
 
 

5

4

1

Summary of Contents for SRG-2000

Page 1: ...Model No SRG 2000 INSTRUCTION MANUAL Manual should be read prior to operation ...

Page 2: ...7373 Fax 201 962 8353 E mail info phase2plus com WebSite http phase2plus com 2 CONTENTS 1 GENERAL 3 2 WORK PRINCIPLE AND STRUCTURE FEATURES 3 3 MAJOR TECHNICAL PARAMETERS 4 4 USE AND OPERATION 5 5 MAINTENANCE AND REPAIR 6 APPENDIX RECOMMENDED SAMPLING LENGTH 7 ...

Page 3: ...ction site 2 WORKING PRINCIPLE AND STRUCTURE FEATURES 2 1 WORKING PRINCIPLE When the motorized sensor is making a linear uniform motion along the test surface the contact stylus being perpendicular to the work surface moves up and down with the work surface Its motion is converted into electric signals which are amplified filtered and transformed into digital signals through a d The signals are th...

Page 4: ...962 8353 E mail info phase2plus com WebSite http phase2plus com 4 FIGURE 2 STRUCTURE OF MAINFRAME 1 Start Test Button 2 Lcd Screen 3 Scale Selection Up 4 Inch Metric Conversion Down 5 Power Switch 6 Charging Socket 7 Stylus Mark 8 Stylus Protective Guard 1 5 6 8 7 4 2 3 1 ...

Page 5: ... 0 4LBS 200G 4 USE AND OPERATION 4 1 OPERATION POWER ON THE DEVICE Press and hold the Red Power button on the front panel for 1 second After a beep sound the device is ready to work The large LCD display will show the measuring parameters and sampling length of the previous test Before taking a test choose the desired parameter Ra Rz Rq or Rt and proper sampling length 2 5 0 8 or 0 25 for sampling...

Page 6: ...te the process Power the unit off This will now save the new calibration Normal measurements can resume at this time 4 3 CONVERTING IN MM Press and hold the keypad for about 1 second The system will convert from Metric to English or English to Metric 4 5 LOW VOLTAGE INDICATOR When the battery symbol is near empty then its time to recharge the SRG 2000 The tester must be recharged before further us...

Page 7: ... 8 0 63 1 25 3 2 6 3 0 8 0 32 0 63 1 6 3 2 0 8 0 25 0 32 1 25 1 6 0 25 0 20 0 25 1 0 1 25 0 25 0 16 0 20 0 8 1 0 0 25 0 125 0 16 0 63 0 8 0 25 0 1 0 125 0 5 0 63 0 25 0 08 0 1 0 4 0 5 0 25 0 063 0 08 0 32 0 4 0 25 0 05 0 063 0 25 0 32 0 25 0 04 0 05 0 2 0 25 0 25 0 032 0 04 0 16 0 2 0 25 0 025 0 032 0 125 0 16 0 25 0 02 0 025 0 1 0 125 0 25 0 016 0 02 0 08 0 1 0 08 0 0125 0 016 0 063 0 08 0 08 0 0...

Page 8: ...struments Beijing Ltd Room 301 Bldg 2 Qing Yuan Xi Li Haidian District Beijing 100192 China Tel 86 10 59792409 Fax 86 10 59814851 General E mail info phase2china com cn MEXICO Phase II de Mexico Calle A No 4 Promer Piso Col San Marcos Azcapotzalco C P 02020 Mexico Tel 011 525 5538 39771 Fax same General E mail phase2mexico hotmail com VENEZUELA Phase II Herramientas Universales EDCM CA Av Francisc...

Reviews: