
21 Industrial Ave
Upper Saddle River, NJ. 07458
Tel: (201)962‐7373
Fax: (201)962‐8353
E‐Mail:
Web Site: http://
www.phase2plus.com
4
Installation
and
adjustment
4.1
Unpack the wood case, then remove the three M10 screws from the underside of the base. Lift the
machine very carefully from the bottom. Remove the all accessories that are attached to the
baseboard by the straps.
4.2
The machine should be mounted on a firm bench or table in a clean area, free from vibration or
shock, recommended height is 800mm. A hole must be provided in the top of the bench to provide
working clearance for the leadscrew refering figure 4.1.
4.3
Place the tester on the prepared bench, turn the hand wheel counter clockwise to lower the anvil,
remove the anti vibration pad; then place a precision level with the accuracy of 0.2mm/m on the
anvil, adjust the leveling feet of tester to make the machine level within 1mm/m, then lock the nuts
on the leveling feet.
Figure 4.1
4.4
For installation, open the upper cover and back cover of tester, then remove all the
packing materials.
Inspect to make sure the blade should be correctly placed in the V
groove as figure 4.2 showing.
(
This is done at the factory but may be out of adjustment
due to transportation of machine.)
Figure
4.2
4.5
Reinstall the upper and back cover and connect the power supply wire.