
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Headlamps
Check the aim and adjust as required.
X
Warning lights in light bar
Check at the ignition start position to verify bulbs and driver
information display function (shown on page 3-11).
X
Turn, Stop, Reverse lights
and signals
Visual check.
X
Check operation and output.
X
Check tightness of the pulley nut.
X
Check the tension of the drive belt (shown on page 5-102).
X
Alternator
Check tightness of the terminal hex nuts.
X
Starter
Check torque on hex nuts.
X
ECM connector
Check the tightness of the ECM connector.
X
Electrical &
lights
Wheel sensors
Check for damaged sensors and connectors, and worn or frayed
wires.
X
(03/17)
Y53-6060-1C1
5-33
5
Summary of Contents for 325 2017
Page 1: ......
Page 2: ......
Page 3: ...348 337 330 325...
Page 4: ......
Page 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Page 44: ......
Page 66: ......
Page 140: ......
Page 144: ......
Page 218: ......
Page 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Page 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Page 370: ......
Page 391: ......
Page 392: ......