
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Lubricate*.
X
Models SPL-90, 1710
and 1810 slip member &
U-joints
Inspect.
U-joint inspections
should be performed
every time a vehicle
comes in for scheduled
maintenance.**
Lubricate*.
X
Driveshafts
Model SPL-100 slip
member & U-joints
Inspect.
U-joint inspections
should be performed
every time a vehicle
comes in for scheduled
maintenance.**
(03/17)
Y53-6060-1C1
5-29
5
Summary of Contents for 325 2017
Page 1: ......
Page 2: ......
Page 3: ...348 337 330 325...
Page 4: ......
Page 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Page 44: ......
Page 66: ......
Page 140: ......
Page 144: ......
Page 218: ......
Page 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Page 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Page 370: ......
Page 391: ......
Page 392: ......