
PREVENTIVE MAINTENANCE SCHEDULE
PREVENTIVE MAINTENANCE (PM) INTERVALS
Recommended PM
Interval
SYSTEM
COMPONENT
MAINTENANCE TASK
I
A
B
C
Fuel tanks
Inspect tanks, brackets, hoses, and fittings for correct location,
tightness, abrasion damage, and leaks; repair or replace as
required.
X
Fuel tank breathers
Check for proper function; clean the drain hoses.
X
Fuel & Tanks
Fuel tank straps
Check the strap tightness; tighten to proper torque value as
required:
Aluminum tank: 30 Lb. ft. (41 N.m.)
Cylindrical Steel tank: 8 Lb. ft. (11 N.m.)
X
5-28
Y53-6060-1C1
(03/17)
5
Summary of Contents for 325 2017
Page 1: ......
Page 2: ......
Page 3: ...348 337 330 325...
Page 4: ......
Page 5: ...Contents Safety Emergency Controls Driving Maintenance Information Index 1 2 3 4 5 6 7...
Page 44: ......
Page 66: ......
Page 140: ......
Page 144: ......
Page 218: ......
Page 298: ...ELECTRICAL Fuse Panel Door 5 88 Y53 6060 1C1 03 17 5...
Page 299: ...ELECTRICAL Fuse Panel Label 03 17 Y53 6060 1C1 5 89 5...
Page 370: ......
Page 391: ......
Page 392: ......