
13
Workshop Manual, TPD 1458E, issue 3 - Perkins Confidential: Green
99
400 Series
To check for run-out of the flywheel and alignment of the flywheel face
Operation 13-3
1 Check the flywheel run-out with a dial test indicator (A). This must be less than 0,20 mm (0.008 in) total
indicator reading.
2 Check the alignment of the flywheel face (B). During this check, keep the crankshaft pressed toward the
front to remove the effect of crankshaft end-float.
B
A0280
A
A0279
Summary of Contents for 403C-11
Page 54: ...This page is intentionally blank...
Page 86: ...This page is intentionally blank...
Page 100: ...This page is intentionally blank...
Page 112: ...This page is intentionally blank...
Page 126: ...This page is intentionally blank...