
11
174
Workshop Manual, TPD 1353E, Issue 3
Peregrine EDi and 1300 Series EDi
To dismantle
Operation 11-6
1 Clean the outside surfaces of the fuel lift pump.
2 Remove the lift pump from the high-pressure pump, see Operation 11-5.
3 Remove the push rod (A12).
4 Remove the end nut (A10).
5 Remove and discard the ’O’ ring (A9) from the end nut.
6 Remove and discard the small ’O’ ring (A11) from inside the end nut.
7 Remove the plunger (A8) the suction valve (A7) the spring seat washer (A6) the spring (A5) and the second
spring seat washer (A4) from the pump body (A1).
8 Remove the delivery valve assembly (A3) from the body.
9 Remove and discard the ’O’ ring (A2) from the delivery valve assembly.
1
W067
A
2
3
4
5
6
7
8
9
10
11
12
BO
SC
H
0
4
40 00
8 134
PF/
KG 24
P
2
2
1
This document has been printed from SPI². Not for Resale
Summary of Contents for 1300 EDi Series
Page 12: ...xii This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 62: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 76: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 122: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 170: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 190: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 198: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 204: ...This page is intentionally blank This document has been printed from SPI Not for Resale...
Page 226: ...This page is intentionally blank This document has been printed from SPI Not for Resale...