Getting Ready to Use the Spotlight 200 . 45
7.
Remove the funnel and wait two minutes.
The liquid nitrogen settles down and bubbling slows.
8.
When the nitrogen stops bubbling, refit the detector cap.
The filled dewar cools the MCT to the correct operating temperature for several hours.
After that, the dewar begins to return to room temperature, and the preamp switches
off power to the MCT.
Summary of Contents for Spotlight 200
Page 1: ...Spotlight 200 User s Guide MOLECULAR SPECTROSCOPY...
Page 6: ...6 Spotlight 200 User s Guide...
Page 7: ...Introduction...
Page 13: ...Warnings and Safety Information...
Page 28: ...28 Spotlight 200 User s Guide...
Page 29: ...Overview of the Spotlight 200...
Page 40: ...40 Spotlight 200 User s Guide...
Page 41: ...Getting Ready to Use the Spotlight 200...
Page 51: ...Preparing Samples...
Page 65: ...Techniques for Collecting Spectra...
Page 112: ...Maintenance...
Page 126: ...126 Spotlight 200 User s Guide...
Page 127: ...Appendices...