Laboratory Requirements
0993-5255
6
-15
Set the outlet gauge pressure for each gas to a value just below the maximum
value (
P
max
).
Never
set the outlet pressure to a value exceeding the maximum pressure
(
P
max
).
Table 6-2. Specifications and Requirements of the Furnace Gases
Gas
Purity
Outlet Gauge Pressure
Max.
Flowrate
kPa
bar
psig
L/min
P
min
P
max
P
min
P
max
P
min
P
max
1.2
Argon
99.996%
350
400
3.5
4.0
50.0
58.0
1.2
Nitrogen
99.996%
350
400
3.5
4.0
50.0
58.0
1.2
Special
particle free;
water free
350
400
3.5
4.0
50.0
58.0
1.2
Summary of Contents for AAnalyst 700
Page 2: ......
Page 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Page 8: ...Contents C 4 0993 5255...
Page 10: ...1 2 0993 5255...
Page 44: ...Safety Regulatory Information 1 36 0993 5255...
Page 46: ...Spectrometer Installation 2 2 0993 5255...
Page 68: ...Spectrometer Installation 2 24 0993 5255...
Page 70: ...Preparing the System 3 2 0993 5255...
Page 84: ...System Maintenance 4 2 0993 5255...
Page 98: ...Parts and Supplies 5 2 0993 5255...
Page 102: ...Laboratory Requirements 6 2 0993 5255...
Page 120: ...Spectrometer System Description 7 2 0993 5255...
Page 136: ...Translations of Warnings 8 2 0993 5255...
Page 146: ...Translations of Warnings 8 12 0993 5255...
Page 185: ...0993 5255 In 1 Index...
Page 186: ...Index In 2 0993 5255...
Page 192: ......
Page 193: ......