background image

1

. Attach the steel legs to the 

base of the instrument with 

the M8 Nyloc Nuts and 2 part 

security caps. 

(1.1) (See 

Assembly Guide)

Install Instrument 

with 1.5m free space 

(from widest point) 
around it.

1.5m

Ground Fixed

KS2 - 400mm

Ground Surface

KS1,2

KS1 - 550mm

KS1 – 700mm

KS2 – 850mm

Installation Instructions

2

. Attach Ground Fixing posts 

to legs

(1.2) (See Ground Fix 

Post Installation Sheet)

5

. Once happy with location of 

the Instrument, 

fill 

holes using 

rapid hardening 

concrete

. Be 

sure to compact concrete 

around legs and leave to dry 

according to manufactures 

guidelines. 

3

.

Excavate 1 hole 

for the Steel 

legs 

250mm diameter by 400-

550mm deep 

depending on 

Key stage, in desired location 

upon decision from customer.

4

. Locate (lower) legs into 

holes making sure they are 

vertical and level prior to 

concreting in place

.

(1.1)

(1.2)

Instrument 

Components:

M10x200 Bolt

x2 

M10 Nut

x4 

6

. Attach the 1 pair of beater 

to the saddle strap on the leg. 

(1.3)

Ground Fix 

Components:

(1.3)

14 Kg

Pair Small Red

Beaters X1

Cadenza

Page 1 of 3

1.5m

Weight of heaviest part 

7kg

(Cadenza)

BS EN 1176

Metric Conversion:

250mm/ 10”

300mm/ 12”

450mm/ 18”

700mm/ 28”

850mm/ 33”

1.5m/ 59”

M8  Nyloc Nut

x4 

M6x20 Security Screw

x2 

M6 Saddle Strap

x1 

2 Part Cover Cap 

x4 

Spares available from  

percussionplay.com 

or from your 

local distributor

Summary of Contents for Soprano Quartet

Page 1: ...nufactures guidelines 3 Excavate 1 hole for the Steel legs 250mm diameter by 400 550mm deep depending on Key stage in desired location upon decision from customer 4 Locate lower legs into holes making...

Page 2: ...M10 Nut x4 Ground Fix Components 14 Kg Pair Small Red Beaters X1 Cadenza Page 2 of 3 BS EN 1176 Thread Lock Solution Required Not Supplied Thread Lock Solution Required Not Supplied Instrument Compone...

Page 3: ...50 250 Aggregate Concrete Excavate a hole with a 250mm diameter tapering down to 350mm diameter and 350mm depth Compact base of hole with 50mm of aggregate Lower ground Fix post attached of instrument...

Page 4: ...urface to prevent marking of polished stainless steel 3 Align holes on legs opposite end to polished domes and secure in place using 3no M10 x 200mm threaded bar and 6no M10 nuts provided Tools requir...

Page 5: ...eaded bar x3 M10 BZP Nut x6 Ground Fix Components 22 Kg 13 4 Kg BS EN 1176 Spares available form percussionplay com or from your local distributor M8x25mm Pin Torx x3 1 2 3 Thread Lock Solution Requir...

Page 6: ...e filling with concrete Fill hole with fast drying concrete to manufacturers specifications 400 50 If Drum needs to be positioned lower a deeper hole can be excavated Ground Fixed Ground Fix Installat...

Page 7: ...tallation Instructions 5 Once happy with location and levels fill holes using rapid hardening concrete Be sure to compact concrete around legs and leave to dry according to manufactures guidelines 6 B...

Page 8: ...oprano Page 2 of 4 Pair Small Beaters X1 TX 30 Driver Bit x1 TX 45 Driver Bit x1 Tools Components M6x20mm Secure Screw X4 Eye Straps X2 M10x50mm Secure Screw X4 Ground Fix Components Thread Lock Solut...

Page 9: ...and use thread locking solution to prevent fixings working loose 650 50 350 250 Aggregate Concrete Ground Fixed Ground Fix Post Installation 1 1 1 2 3 5 6 600mm max depth 7 4 M10x200 Threaded Bar x4 M...

Page 10: ...sing 8x70mm screws supplied Fill holes with fast drying concrete to manufacturers specifications If posts protrude above instrument they can be cut down 650 350 250 50 600 Ground Fix Installation 1 1...

Page 11: ...y screws square washers and PU mounts 1 1 See Assembly Guide 300mm Ground Surface S M L Small 800mm Medium 800mm Large 800mm Installation Instructions 1 1 1 2 Instrument Components M10x50 Security Scr...

Page 12: ...Ground Fix Components M10x30 Security Screw x4 M10x50x3 Square washer x4 M10x200 Bolt x2 M10 Nut x4 PU 200 Mount PU 250 Mount x2 x2 Played with hands Congas Page 2 of 3 TX 45 Driver Bit Tools x1 BS EN...

Page 13: ...base of hole with 50mm of aggregate Lower ground Fix post attached of instrument into hole check instrument straight and level before filling with concrete Ground Fixed Components Ground Fix Post Ins...

Reviews: