1
. Attach the steel legs to the
base of the instrument with
the M8 Nyloc Nuts and 2 part
security caps.
(1.1) (See
Assembly Guide)
Install Instrument
with 1.5m free space
(from widest point)
around it.
1.5m
Ground Fixed
KS2 - 400mm
Ground Surface
KS1,2
KS1 - 550mm
KS1 – 700mm
KS2 – 850mm
Installation Instructions
2
. Attach Ground Fixing posts
to legs
(1.2) (See Ground Fix
Post Installation Sheet)
5
. Once happy with location of
the Instrument,
fill
holes using
rapid hardening
concrete
. Be
sure to compact concrete
around legs and leave to dry
according to manufactures
guidelines.
3
.
Excavate 1 hole
for the Steel
legs
250mm diameter by 400-
550mm deep
depending on
Key stage, in desired location
upon decision from customer.
4
. Locate (lower) legs into
holes making sure they are
vertical and level prior to
concreting in place
.
(1.1)
(1.2)
Instrument
Components:
M10x200 Bolt
x2
M10 Nut
x4
6
. Attach the 1 pair of beater
to the saddle strap on the leg.
(1.3)
Ground Fix
Components:
(1.3)
14 Kg
Pair Small Red
Beaters X1
Cadenza
Page 1 of 3
1.5m
Weight of heaviest part
7kg
(Cadenza)
BS EN 1176
Metric Conversion:
250mm/ 10”
300mm/ 12”
450mm/ 18”
700mm/ 28”
850mm/ 33”
1.5m/ 59”
M8 Nyloc Nut
x4
M6x20 Security Screw
x2
M6 Saddle Strap
x1
2 Part Cover Cap
x4
Spares available from
percussionplay.com
or from your
local distributor