background image

Ground Fixed 

Components: 

1

Carefully lay 3 x legs 

on a 

level surface 

and check 

distance between each 

leg is 

equal

. Join together the 2 

parts of the symphony. Line up 
pre drilled holes in the 
backboards with the legs and 
ensure the instrument is 
aligned square with the legs. 

Fix 

in place using 

6x80mm

 

screw

s supplied (see 

installation guide) 

 
 

 

2

.(See ground fix 

sheet)

Excavate 3

 

holes

 on site 

of installation approximately 

600mm

 

deep

 ( adjust depth 

according to age range for 
intended players)  
 
 
 

 

 

3

Carefully raise 

the 

instrument

 from the ground 

with legs attached 

and locate 

(lower) legs 

into

 

holes

 making 

sure they are vertical and level 
prior to concreting in place.  
 
 
 
 

Installation Instructions 

4

. Once happy with location 

and levels, 

fill 

holes using 

rapid hardening 

concrete

. Be 

sure to compact concrete 
around legs and leave to dry 
according to manufactures 
guidelines 
 
 
 

 

 

5

. Beaters can be fixed to  

wooded posts with fixings 
provided 
 
 
 

 

 

KS2 

  

KS2 – 850mm 

 

 

Ground Surface

  

Pair Small  

Beaters X3 

25 Kg 

BS EN 1176

  

1.5m

  

Weight of heaviest part 

12kg

 (Freechimes Left Panel) 

 

1.5m

  

600mm 

  

Install Instrument 
with 1.5m free space 
(from widest point) 
around it.

  

10x38mm 

Secure Screw 

X6 

Eye Straps 

X3 

Freechimes  

Symphony 

Page 1 of  4 

6x80/50 

Screw X10 

Metric Conversion: 
600mm/ 24” 
850mm/ 33” 
1.5m/ 59” 

Spares available form  

percussionplay.com 

or from your 

local distributor 

Reviews: