background image

Ground Fixed

Components:

1. Carefully lay 3 x legs on a 
level surface and check 
distance between each leg is 
equal. Join together the 2 
parts of the symphony. Line 
up pre drilled holes in the 
backboards with the legs and 
ensure the instrument is 
aligned square with the legs. 
Fix in place using M8x40mm
screws supplied (see 
installation guide)

2.(See ground fix 
sheet)Excavate 3 holes on 
site of installation 
approximately 600mm deep
adjust depth according to age 
range for intended players) 
Insert M10 Bar and nuts into 
holes at base of legs

3. Carefully raise the 
instrument from the ground 
with legs attached and locate 
(lower) legs into holes making 
sure they are vertical and 
level prior to concreting in 
place. 

Installation Instructions

4. Once happy with location 
and levels, fill holes using 
rapid hardening concrete. Be 
sure to compact concrete 
around legs and leave to dry 
according to manufactures 
guidelines

5. Beaters can be fixed to 
Stainless Steel posts with 
fixings provided

KS2 

KS2 

850mm

Ground Surface

30 Kg

BS EN 1176

1.5m

Weight of heaviest part 

18kg

(Freechimes Left Panel)

1.5m

600mm 

Install Instrument 
with 1.5m free space 
(from widest point) 
around it.

Freechimes

Diatonic 

Symphony

Page 1 of  4

M6x20mm

Secure Screw

X6

Eye Straps

X3

M8x40mm

Secure Screw

X10

M8 Lock Washer

X10

Metric Conversion:

600mm/ 24”
850mm/ 33”
1.5m/ 59”

Spares available from  

percussionplay.com 

or from your 

local distributor

M10x200 Threaded Bar

x6

M10 Nut

x12 

Ground Fix 
Components:

Pair Large Red

Beaters X2

Pair Small 

Beaters X1

Reviews: