
Assembly and Operation Manual
8.9.6 Section top cover
Prior to installation of the section top cover (10), check whether all cables have been properly
connected to the indication control module (see Fig. 20, Sect. 8.9.2).
Installation order of the
STC-01G
(
SDC-01G
) and
STC-01S
(
SDC-01S
) section top covers
(see Fig. 23):
Connect the connection cable from the indication control module (“PASS” connector, Fig. 20) to
the top cover indication block (for
STC-01G
,
SDC-01G
).
Carefully lay down the cover on top of the housing, the fixing brackets should lean on the
protection plates.
To prevent the cables from the damage, ensure that they do not get
stuck between the fixing brackets and protection plates!
Fasten eight M5×16 screws and washers using a SW4 Allen wrench included in the installation
kit through the holes in the bottom part of the top duct of the section.
Figure 23. Installation of the
STC-01G
(
SDC-01G
) section top cover
Installation order of the
STC-01GS
(
SDC-01GS
) section top covers (see Fig. 24):
Take one glass piece of the top cover featuring an indication block and connect the connection
cable of the indication control module (“PASS” connector, Fig. 20) to the top cover indication
block.
Carefully lay down the cover on top of the housing, the fixing brackets should lean on the
protection plates.
To prevent the cables from the damage, ensure that they do not get
stuck between the fixing brackets and protection plates!
Using SW4 Allen wrench fasten
the top cover piece with two M5×16 screws with washers included into installation kit through
the holes in the bottom part of the section top duct. Do not tighten fully the screws in order to be
able to adjust them further.
Mount the other glass top cover piece similarly.
36