Assembly and Operation Manual
21. If needed, access card reader can be installed in the special openings inside the top duct of
the side posts (see Fig. 20) or, in case of using
MR-07OEM
, the reader is to be sticked to the
top cover underneath the indication block. Use the double-sided tape to fix readers and, if
needed, non-metal pads for the reader to be placed as close to the top cover as possible in
order to increase the read range. Carefully route reader cables through the top duct into the
central post where the ACS-controller cable is to be led through the default holes. Cables
should not be routed between or near the holes used for fastening the section top cover. This
will prevent the cables from damage. Use self-adhesive cable tie mounts for cable fastening. It
is prohibited to fix cables to the internal wiring cables and to the control boards of the intrusion
detectors. It is also prohibited to route cables near the control boards where the detectors are
located.
Attention!
Access card readers
are not included
in the standard delivery set of the turnstile!
The selection of the readers, its purchase and installation into the product is carried out by
the customer (installer) in accordance with the checkpoint design and the characteristics of
the access control system and the control controller. It is possible to install readers as
manufactured by
PERCo
(
IR03.1
,
MR07 OEM
,
RP-15.2
), and third-party manufacturers.
Readers must meet the following requirements:
Overall dimensions (length × width × height) .................................. max 155×68×28
mm
Read range..................................................................................................... min 40 mm
provided that the reader is located as close to the top cover as possible.
22. Unpack the glass swing panels (1) and mount them (Fig. 21, Sect. 8.9.3).
23. Mount swing panel cover plate (4) from installation kit (Fig. 21, Sect. 8.9.4).
24. Mount front panels (8) (Sect. 8.9.2). After installation make sure that the top edges of the
panels are flush with the section housing. Front-end indication block panel should be
installed where indication control module is located. This module is fixed to one of the two
steel protection plates in the top duct (see Fig. 20). However, the front-end indication block is
to be connected to the indication control module with a connection cable. The connection
cable connected to the
ARROW
connector of the indication control module will activate the
white arrow on the front-end indication blocks. The cable connected to the
CROSS
connector
will activate the red cross (Sect. 5.2.2, 8.9.2, Fig. 20).
25. Mount central post indication blocks (3) (see Fig. 22, Sect. 8.9.5) (included in the installation
kit).
26. Install section top covers (10) (see Fig. 23, 24 Sect. 8.9.6).
27. Use switches on the
Master
section control board (side of the section) (see Sect. 5.2.4) in
order to:
Set speed gate operating mode by using the
Pulse
switch.
Select the rotation direction of swing panels as an alarm reaction to the Fire Alarm
device.
Use the
FA Dir
switch.
Set the size of swing panels that will be mounted for the passage lane by using
Size1
,
Size2
switches (see Table 1).
28. Perform a test run as described in Sect. 9.1.
29. If needed, adjust the level of swing panels relative to each other and set the speed gate into
training mode, then close the swing panels manually as described in Sect. 8.7.
30. Check the speed gate correct operation by sending commands from the RC-panel (see
31. Execute operations, in the same way as described in points 20 – 30, for all other passage
lanes.
32. Mount central post cover plate (5) (Sect. 8.9.1).
The speed gate is ready for operation once the installation and testing are finished.
26