Certificate & Operation Manual
6
2. Lead the connection cables to the speed gate, connect, and place the connection cables:
•
to the speed gate indication control module
– cable for the indication front module (7)
1
,
•
to the power supply 24VDC
– power supply cable for the card capture reader (9)
2
,
•
to the ACS-controller
– cable for the built-in reader and control cable for the card capture
reader (10).
3. Install the
FP-01C
panel on the
ST-01
speed gate by using the fixing hooks (5).
4. Install back the speed gate glass cover.
5.2
Connection layouts of a built-in card capture reader
Figure 4. Diagram for connecting the card capture reader to the PERCo ACS-controllers
via RS-485 (list of components mentioned in the Table 1)
1
For the white arrow indication on the front panel the connection cable should be connected to the
ARROW
terminal, for the red
– to the
CROSS
terminal (see Sect. 8.9.2
ST-01 Operation manual
).
2
In function of power supply,
it’s possible to use the
ST-01
gate power supply (contacts 1 and 2,
X1
terminal,
ST-01.771 control board or any of ST-01.761) which can provide the current not less than 8A during 10
seconds.
Summary of Contents for FP-01C
Page 21: ......