background image

PSE4-SC-01 

 

ORIGINAL BETRIEBSANLEITUNG 

TECHNICAL INSTRUCTION 

Seite/Page 8/8 

 

Ausgabestand/Issue date 2019-04-15 

Maschine / Bauvorhaben 

______________________________________________

______________________________________________

______________________________________________

______________________________________________ 

Machine / Building project 

______________________________________________

______________________________________________

______________________________________________

______________________________________________

Eingebaute Komponenten 

Used Components 

 

 

Bezeichnung / Designation 

Signalauswertung 

Control unit 

 

Profil Signalgeber 

Rubber-Profile 

 

Sender 

Transmitter 

 

Empfänger 

Receiver 

 

AL-Montageleiste 

Al mounting rail 

 

 

Wartung der Schaltleiste 

Im  Rahmen  der  Inbetriebnahme  und  der  regelmäßigen 

Wartungen der Maschine sollte die Schaltleiste von einem 

Sachkundigen in folgenden Punkten überprüft werden: 

1.  Sichtprüfung des Signalgebers 

Begutachtung  der  Signalgeberoberfläche  und  ihrer  An-

schlüsse, um sicherzustellen, dass keine Schäden verur-

sacht  wurden,  die  den  bestimmungsgemäßen  Betrieb 

verhindern. 

2.  Sichtprüfung der Signalübertragung 

Begutachtung  der  Anschlüsse,  um  sicherzustellen,  dass 

keine Veränderungen vorgenommen wurden oder Schäden 

vorliegen, die sich nachteilig auf das System auswirken. 

3.  Sichtprüfung der Signalauswertung 

Begutachtung  des  Gehäuses,  ob  dies  im  guten  Zustand 

und  geschlossen  ist.  Begutachtung  der  Anschlüsse,  um 

sicherzustellen, dass keine Veränderungen vorgenommen 

wurden  oder  Schäden  vorliegen,  die  sich  nachteilig  auf 

das System auswirken. 

4.  Funktionsprüfung der Schaltleiste 

Betätigung des Signalgebers an mehreren beliebigen Posi-

tionen  bei  stehender  Maschine.  Die  Empfindlichkeit  der 

Schaltleiste sollte über die gesamte wirksame Betätigungs-

fläche gegeben sein. Kontrolle der LED in der Auswertung. 

 

Betätigung  der  Schaltleiste bei  bewegter  Maschine  muss 

zum Anhalten führen. Bei Toren muss eine Reversierung 

eingeleitet  werden.  Der  Wiederanlauf  der  gefahrbringen-

den  Teile  sollte  nicht  möglich  sein,  bis  die  Sicherheits-

funktion wiederhergestellt wurde. 

Maintenance of the safety edge  

In the context of the start-up and the regular maintenance of 

the  machine  the  safety  edge  should  be  checked  by  skilled 

persons in the following points: 

1.  Visual inspection of the signaling element: 

Inspection  of  the  surface  and  the  connections  to  guarantee 

that  no  damage  was  caused  which  prevents  the  intended 

operation. 

2.  Visual inspection of the signal transmission: 

Inspection  of  the  connections  to  guarantee  that  no  damage 

was  caused  and  no  modification  was  made  which  prevents 

the intended operation. 

3.  Visual inspection of the control unit: 

The housing has to be closed and should be in a good state. 

Inspection  of  the  connections  to  guarantee  that  no  damage 

was  caused  and  no  modification  was  made  which  prevents 

the intended operation. 

4.  Test of the safety edge: 

Actuation  of  the  signaling  element  at  several  positions  with 

standing  machine.  The  sensitivity  of  the  safety  edge  should 

be  given  over  the  entire  sensing  surface.  A  check  of  the 

LEDs in the control unit should be performed. 

 

Actuation  of  the  signaling  element  with  moving  machine.  A 

stop must be executed. Regarding gates, a reversion must be 

initiated.  The  restart  of  the  machine  should  not  be  possible 

until the safety function was restored. 

 

 

 

 

Fuchs GmbH 
Lilienthalstraße 200 
68307 Mannheim 
Germany 

Summary of Contents for PSE4-SC-01

Page 1: ...n Auf ausreichende Schutzbeschaltung der Ausgangs kontakte bei kapazitiven und induktiven Lasten ist zu achten Die Freigabepfade sind nach DIN VDE 0110 Teil 1 sicher getrennt bis 300 V 1 XX steht stel...

Page 2: ...Forderungen der Schutz klasse IP54 erf llen Anschlussvoraussetzungen Leiterquerschnitt 2 x 1 5 mm Kapazit t 150 nF km Widerstand 28 km Temperatur 25 C Die Angaben im Abschnitt Technische Daten sind un...

Page 3: ...SL XX3 an bn wh gn anschlie en Sicherheitsausgang in den Maschinenkreis einbinden Klemme 14 24 Signalausgang X1 ist kein Sicherheitsausgang und darf nur als Meldekontakt genutzt werden npn open Colle...

Page 4: ...ertification E344450 Schutzart Geh use IP40 Klemmen IP20 Protection class Housing IP40 Clamps IP20 Geh usematerial Polyethylen schwarz Crastin grau Housing material Polyethylene black Crastin grey Geh...

Page 5: ...32 ms Einschaltdauer 100 ED 100 CDF Cyclic duration factor 100 ED 100 CDF Anzeigen und Ausgangskontakte Indications and terminal assignments Power Gr ne LED Power Green LED Channel Gr ne LED Channel G...

Page 6: ...PSE4 SC 01 ORIGINAL BETRIEBSANLEITUNG TECHNICAL INSTRUCTION Seite Page 6 8 Ausgabestand Issue date 2019 04 15 Zeichnung Drawing Funktionsschaltbild Connection diagram PSE4 SC 01...

Page 7: ...ossible after an activation of the sensing edge Anzeige Indication Betriebszustand Operation mode M gliche Ursachen Possible cause Abhilfe Remedy Alle LEDs an All LEDs on OK OK POWER LED aus POWER LED...

Page 8: ...ng der Schaltleiste Bet tigung des Signalgebers an mehreren beliebigen Posi tionen bei stehender Maschine Die Empfindlichkeit der Schaltleiste sollte ber die gesamte wirksame Bet tigungs fl che gegebe...

Reviews: