IDM-Z2-161-M-1D-J2-BT-N-N0, IDM-Z2-161-M-1D-J2-BT-P-N0, IDM-Z2-261-M-2D-J2-BT-
2
02
2-
01
21
Using the base station in explosion-hazardous areas - system structure
1
Use the connection cable CBL-IDMx* to connect the base station to the cable barrier SK-IDM-
Z2-J2-*. First, install the RJ50 male connector of the connection cable into the RJ50 port of the
base station. The port is on the bottom side of the base station. The connection cable is prop
-
erly installed when you can hear an acoustical click. Ensure that the connection cable is firmly
connected. Then proceed and connect the M12 connector of the connection cable with the
female M12 connector of the cable barrier connection cable. This cable is pre-installed and
shipped with the cable barrier.
Figure 5.4
Connecting RJ50 connector of connection cable CBL-IDM* to base station.
Figure 5.5
Male M12 connector of connection cable CBL-IDM*.